You are here : Hidro Power in India
The Indian Power Sector Scenario
As per the Ministry of Power (“MoP”), Government of India (“GoI”), the all India installed capacity of electric power generating stations was 112,058.42 MW as on March 31, 2004. This total capacity consisted of 29,500.23 MW hydro power based capacity, 77,968.53 MW thermal power based capacity, 2,720 MW nuclear power based capacity and 1,869.66 MW wind power based capacity. A capacity addition target of 5,202.34 MW consisting of 3,765.00 MW of hydro power and 1,437.34 MW of thermal power was envisaged for the year 2003-04. As against the aforesaid capacity addition target, a capacity addition of 3,951.62 MW consisting of 2,590.00 MW of hydro power and 1,361.62 MW of thermal power was achieved. (Source: MoP website). The 16th Electric Power Survey (“EPS”) carried out by the Central Electricity Authority has projected a peak demand of 115,705 MW and an energy requirement of 719,097 MU by the end of 10th Five Year Plan (2002-07), while the peak demand and energy requirement by the end of the 11th Five Year Plan (2007-12) has been projected at 157,107 MW and 975,222 MU respectively. The GoI has targeted capacity additions of about 41000 MW during 10th Five Year Plan. Further, in order to provide power on demand to all consumers by 2012, the GoI plans to add around 100,000 MW of additional capacities during the 10th and 11th Five Year Plan periods. (Source: 16th EPS and Crisinfac report ’State of the Industry’). Back to Top
Installed Generation Capacities (FY 2000-FY 2004) by Generation
Back to Top
Installed Generation Capacities by Sector (FY 2004)
Back to Top
Capacity Utilisation
Back to Top
Capacity Addition Program (Tenth Plan)
Back to Top
Power Supply Position
The country has in the recent past has being experiencing chronic peak shortages of power availability. While the peak shortages have come down from 20.5% in 1992-93 to 12.2% in 2002 -03, overall power shortages have firmed up to 8.8% in 2002-03 from 7.3% in 1992-93. The chart below summarizes the power shortage scenario in the country. ![]() Back to Top
Projected Energy Demand
Back to Top
Projected Peak Demand
Back to Top |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||